
Here's a look at the destruction/construction we just finished living  with at  our house.  We decided we wanted to put in laminate flooring in  the hallway,  living room, dining room and kitchen.  This should only  take a couple of days  which turned into two long weeks.  The picture of  my bedroom isn't as bad as it  became.  We went on two different  weekend trips during this and there was more  stuff that was brought in.   I had a path around the bed, into the bathroom, and  out of the room  and that is about it.  It's still not all moved back out but  it's  closer.  The other picture shows what my living room looked like for a  week  (washer/dryer/fridge all located there) and the little path to the  front  door.


And here are finished pictures.  It's not as clean as I wanted it for pictures, but if I waited for that you might not every see pictures.  (I do have four small children who know how to fend for themselves when it comes to getting food, and spilling it, and smashing it.  And I also took the pictures to not show most of it.  hehehe)

Loving it now that it is done.  There is still some small stuff to do (finish up caulking, sweep continuously, etc).  Oh and there is tile by the door to the garage and the in the laundry room but no picture of that.  There you have it!
 
3 comments:
The floor looks good!
Looks great!
I love this! It looks so nice!
Post a Comment